Details for INVITATION FOR BIDS

INVITATION FOR BIDS Sealed bids for construction of the following project(s) will be received by the Montana Department of Transportation, Construction Contracting Bureau, Room 101, 2701 Prospect, Helena, Montana until 9:00 a.m. on June 13, 2019. All bids being publicly opened, reviewed for correctness, and then publicly read in the Department's auditorium. 101 KILA-E & W ELK HILL NHIP 1-2(221)106 NH 1-1(104)66 NHIP 1-2(221)106 - Milling, tack, pms overlay and full-width seal & cover and fog seal, guardrail and signing on the Kila - East & West project in Flathead County. The 7.2 mile project is located 6 miles southwest of Kalispell on US 2 (N-1) between RP 106.5 and 113.6. NH 1-1(104)66 - Milling, tack, pms overlay and full-width seal & cover and fog seal, guardrail and signing on the Elk Hill project in Lincoln County. The 3.4 mile project is located 32 miles south and east of Libby on US 2 (N-1) between RP 65.6 and RP 69.0 (East end of Elk Cr Rd grade separation). 102 SNOW FENCE-N OF BIG TIMBER HOBSON - EAST (SNOW FENCE) SNOW FENCE-NORTH OF HARLOWTON STPP 45-1(28)23 NH 57-2(40)59 NH 63-1(24)0 STPP 45-1(28)23-The Snow Fence-N of Big Timber project consists of snow fence construction and installation at numerous locations from RP 22.6 to RP 42.6 on State Primary Route 45/US 191 between Big Timber and Harlowton. This project is located in both Sweet Grass and Wheatland County. NH 57-2(40)59-The Hobson - East (Snow Fence) project consists of snow fence construction and installation at numerous locations from RP 58.6 to RP 63.2 on National Highway Route 57/MT 200 near Hobson and extending east. The project is located in Judith Basin County. NH 63-1(24)0-The Snow Fence-North of Harlowton project consists of snow fence construction and installation, and concrete snow fence salvage between RP 0.4 to RP 3.6 on National Highway Route 63/US 191 near Harlowton and extending northeast. The project is located in Wheatland County. 103 SF 169 FLATHEAD CNTY SFTY SF 169 MSLA CNTY SFTY IMPRV SF 169 RAVALLI CNTY SFTY SF 169 MINERAL CNTY SFTY IMPRV HSIP STWD(553) HSIP 32(107) HSIP 41(80) HSIP STWD(535) HSIP STWD(553) - Signing, delineation, guardrail, and chevrons on the SF 169 Flathead County Safety project in Flathead County. The project consists of the following 12 sites in Kalispell, Whitefish, Columbia Falls, Somers and Libby: 1. Whitefish Stage Road, Kalispell, RP 0.4 to RP 0.7, 2. Blanchard Lake Road, Whitefish, RP 2.4 to RP 3.1, 3. Lower Valley Road, Kalispell, RP 1.9 to 2.4, 4. Lower Valley Road, Kalispell, RP 4.9 to 5.4, 5. Helena Flats Road, Kalispell, RP 0.0 to 6.5, 6. Columbia Falls Stage Road, Columbia Falls, RP 0.0 to 1.1, 7. Rose Crossing, Kalispell, RP 0.2 to RP 1.2, 8. Halfmoon Road/Edgewood Drive, Whitefish, RP 0.1 to RP 7.5, 9. Whalebone Drive, Kalispell, RP 1.2 to 1.9, 10. Somers Road, Somers, RP 0.5 to 1.0, 11. Ashley Lake Road, Kalispell, RP 3.7 to 4.5, 12. Parmentor Creek Road, RP 0.0 to RP 0.3 HSIP 32(107) - Signing and Delineation on the SF 169 Missoula County Safety Improvement project in Missoula County. The project consists of the following 8 sites around Missoula and the Huson area: 1. Pattee Canyon Road, RP 0.5 to RP 2.2, 2. Pattee Canyon Road, RP 2.3 to RP 3.7, 2a. Pattee Canyon Road, RP 4.4 to RP 4.7, 2b. Deer Creek Road, RP 5.0 to RP 5.2, 2c. Deer Creek Road, RP 5.4 to RP 5.5, 2d. Deer Creek Road, RP 5.5 to RP 5.7, 2e. Deer Creek Road, RP 5.9 to RP 6.1, 3. Deer Creek Road, RP 8.5 to RP 8.9, 4. Deer Creek Road, RP 9.8 to RP 10.7, 5. Rogers Street/Cemetary Road, RP 0.01 to RP 0.8, 6. Lower Miller Creek Road, RP 0.050 to RP 0.800, 7. Sixmile, RP 5.6 to RP 5.8, 8. Blue Mountain Road, RP 0.2 to RP 0.5. HSIP 41(80) - Signing and Delineation on the SF 169 Ravalli County Safety project in Ravalli County. The project consists of the following 2 sites: 1. S-473, South of Darby, Install panel delineation RP 5.0 - RP 5.5 and standard delineation RP 0.0 - RP 14.4. 2. West River Road, Hamilton, Replace and install supplemental curve signing RP 1.25 - RP 1.35. HSIP STWD(535) - Signing and Delineation on the SF 169 Mineral County Safety Improvement project in Mineral County. The project consists of the following 4 sites: 1. I-90, West of Saltese, RP 4.65 to RP 4.75, 2. I-90, SE of Superior, RP 53.0 to 54.0, 3. I-90, West of Alberton, RP 66.0 to 66.2, 4a. East Mullan Road, SE of Superior, RP 2.4 to RP 2.6, 4b. East Mullan Road, SE of Superior, RP 6.0 to RP 6.2. 104 SIDEWALKS PHASE II - CASCADE TA 7(73) Sidewalks, C & G and ADA curb ramps on the Sidewalks Phase II - Cascade project in Cascade County. The project is located in the southern area of the town of Cascade on portions of Second and Third Street and Third Avenue South for a total of 8 blocks. 105 O ST - BENNETT ST CONNECTOR - LIVINGSTON TA 7499(16) Installation of ADA sidewalks, curb/gutter, drainage, fencing and multi-use asphalt path on the O Street-Bennett Street Connection-Livingston project located in Livingston in Park County. The project begins at RP 55.2 near the intersection of O Street and Park and extends northeast along Park to RP 55.6. 106 BIG COULEE - 5M SW FAIRFIELD STPB 9050(25) Remove structure, replace with box culvert, gravel surfacing and fencing on the Big Coulee-5M SW Fairfield project located in Teton County. The project is located at RP 0.3 on Local Route 50-412 (2nd Road SW) 5 miles southwest of Fairfield. 107 PARK DR/4TH AVE N PED XING - GTF TA 5208(4) Sidewalk, C & G, pedestrian path, storm drain, trees and sodding on the Park Drive/4th Avenue North Pedestrian Crossing - GTF project in Cascade County. The project is located in Great Falls at the junction of Park Drive (U-5208)/2nd Street N (U-5208)/4th Avenue N with an additional shared-use path within Gibson Park. 108 HSIP PROGRAM JOC - MISSOULA HSIP STWD(680) This project includes the installation of signs, delineation, and solar flashers within MDT's Missoula District. Refer to Exhibit B & C for sites on the initial Job Order #1. Additional sites will be identified in subsequent job orders of this project. These sites may be located on NHS Interstate, NHS Non-Interstate, Primary, Secondary, and County or City routes. 109 SF 159 BIG TIMBER SFTY IMPRV HSIP 298-1(17)0 Centerline and shoulder epoxy striping, curve signing and delineation on SF 159 Big Timber Safety Improvement project in Sweet Grass County. This project is located on Secondary 298 beginning in Big Timber at the intersection with P-91, known as I-90 Frontage Road, at RP 0.0 and extends south to RP 25.6. Bid documents and instructions to bidders may be obtained from the Construction Contracting Bureau. These documents may be requested by FAX (406)444-7236 (see order form), by mail, by downloading at the following web site: http://www.mdt.mt.gov/ business/contracting/ under "Bid Packages" link, or by calling (406)444 6215, 6212 or TTY 444 7696. Any contract entered into pursuant to this advertisement is subject to all appropriate state and federal civil rights laws. The prime and subcontractors are required to pay the wage rates set out in the bid proposal. MDT will not discriminate on the basis of race, color, national origin or sex in the award, performance or administration of any MDT contract or in the administration of its DBE program (49 CFR Part 26). MDT attempts to provide reasonable accommodations for any known disability that may interfere with a person participating in any service, program or activity of the department. Alternate accessible formats of this document will be provided upon request. If reasonable accommodation is needed to participate in MDT bid lettings, call the Civil Rights Bureau at 444-6331 or TTY 406-444-7696 [TTY 1-800-335-7592 (toll free)]. MONTANA DEPARTMENT OF TRANSPORTATION Barb Skelton, Chairperson Montana Transportation Commission Michael T. Tooley Director of Transportation Published May 18, 25, 2019

Categories

You may be interested in